-- card: 19763 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Mark Completed -- part 27 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=56 right=71 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 28 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=71 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 31 (button) -- low flags: 00 -- high flags: A003 -- rect: left=246 top=248 right=267 bottom=451 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Lag Time Dialog Box ----- HyperTalk script ----- on mouseUp go card id 77420 end mouseUp -- part contents for background part 6 ----- text ----- Shows that the selected task has been completed by filling the task box with dots in the Schedule Chart, making the actual bar black in the Task Timeline and Resource Timeline, and displaying 100 in the % Done field in the Project Table. When the selected task has been marked as completed, the command changes to Mark Uncompleted. Choosing this removes the dots from the selected box, turns the actual bar white in the timeline charts, and returns the % Done field to 0. -- part contents for background part 7 ----- text ----- Lets you specify a lag time between the two tasks connected by the selected dependency line in the Schedule Chart. Lag time is the amount of time between the start or finish of one task and the start of another task. MacProject II adds the lag time to the project schedule and displays its duration on the dependency line. If you’re using a start-to-start lag time, an asterisk (*) is placed next to the duration. -- part contents for card part 27 ----- text ----- Mark Completed/Mark Uncompleted -- part contents for card part 28 ----- text ----- Lag Time... -- part contents for background part 28 ----- text ----- Mark Completed & Lag Time -- part contents for background part 27 ----- text ----- The Task Menu